Case Study

Bucherer

£500,000 Value
12 Weeks Duration
Westfield, White City Location

The Brief:

High end retail fit out

The Project Involved:

  • Manufacture of bespoke joinery and furniture
  • Carpentry, decoration and flooring works
  • Electrical installation
  • Shopfront signage manufacture and installation

Related Case Study

Internationally renowned watch and jewellery retailer – IWC

This project involved the internal remodeling of an existing store on New Bond Street.

Read this case study

Related Case Study

Façade retention project for Premier Jewellery Retailer

This project required major facade retention, which involved the keeping of the listed facade, top floor and roof and the demolition of the entire structure down to basement level and the reconstruction of the new building.

Read this case study

Related Case Study

Bucherer, Westfield

High end retail fit out

Read this case study
 

Ready to talk?

Get in touch using the channels below or click the ‘Request call back’ button and we’ll give you a call at your convenience.

Close

Request a Call Back

Please leave your details below and we’ll get back to you within 24 hours.

Error: Contact form not found.