Case Study

Internationally Renowned Fashion Retailers – Global Flagship Store and Offices

£16 Million Value
60 Weeks Duration
New Bond Street Location

The Brief:

This project involved the structural remodeling and fitting out of a high-end fashion boutique and 3000m2 of Office space.

The Project Involved:

  • The demolition and stripping out of existing bank, including the complete façade, roof, 2 five story lift shafts.
  • The structural alterations for new feature staircase through 3 floors, new Portland stone façade, installation of 4 new lifts, 3 new staircases and structural cantilevered staircase.
  • Fitting out 2000m2 of high quality retail space
  • Fitting out 3000m2 of office space including many architectural features
  • Full Mechanical and Electrical installation
  • Marble stone floors, feature ceilings and bronze shopfront
  • New roof
  • New 5th floor extension

Results:

Following the completion of the project, we were awarded a second project with this Client

Related Case Study

Façade retention project for Premier Jewellery Retailer

This project required major facade retention, which involved the keeping of the listed facade, top floor and roof and the demolition of the entire structure down to basement level and the reconstruction of the new building.

Read this case study

Related Case Study

Flagship Store – New Bond Street

This project involved the structural remodeling and fitting out of a high end fashion boutique whilst retaining listed internal features.

Read this case study
 

Ready to talk?

Get in touch using the channels below or click the ‘Request call back’ button and we’ll give you a call at your convenience.

Close

Request a Call Back

Please leave your details below and we’ll get back to you within 24 hours.

Error: Contact form not found.